Rollback fails due to forward-only change: pre-release and first 30 minutes checklists

A rollback is impossible because the data or schema has already moved forward.

The pre-release checklist maps each item to a test class from the incident page. The first-30-minutes checklist covers detection, containment, the rollback decision and customer communication.

7 pre-release items · 7 first-30-minutes items · verified 2026-10-22

Pre-release checklist

  • PR-01
  • PR-02
  • PR-03
  • PR-04
  • PR-05
  • PR-06
  • PR-07

First 30 minutes

  • FM-01
  • FM-02
  • FM-03
  • FM-04
  • FM-05
  • FM-06
  • FM-07

Download the checklist

Only in this checklist

PR-01 is the only item among 5 published checklists in this group that relies on migration tests: Apply each column type change to a production-shaped copy, write rows with the new type, run its down migration, and fail when the down migration errors.

Questions

What should be checked before a release to prevent Rollback fails due to forward-only change?

7 pre-release items, PR-01 to PR-07. PR-01: Apply each column type change to a production-shaped copy, write rows with the new type, run its down migration, and fail when the down migration errors.

Is there a rollback plan for Rollback fails due to forward-only change?

The first-30-minutes checklist has 7 items. FM-01: Compare the error pattern before and after the rollback, and treat errors that change but persist as a sign that data has moved forward.

What should a team do in the first 30 minutes after Rollback fails due to forward-only change is detected?

The first-30-minutes checklist has 7 items. FM-01: Compare the error pattern before and after the rollback, and treat errors that change but persist as a sign that data has moved forward.

Is a Rollback fails due to forward-only change checklist still needed if deployment is automated?

Yes. Automation runs the steps; the checklist names what the tests must cover: migration tests and chaos and resilience tests.

Which pipeline stages does the Rollback fails due to forward-only change checklist cover?

The pre-release items map to the pre-deploy and post-deploy stages.

In what formats can the Rollback fails due to forward-only change checklist be downloaded?

Both checklists download as Markdown files: /downloads/rollback-fails-due-to-forward-only-change-pre-release.md and /downloads/rollback-fails-due-to-forward-only-change-first-30-minutes.md, licensed CC BY 4.0.