Encoding or timezone shift: pre-release and first 30 minutes checklists

Stored timestamps or strings are shifted or corrupted after a driver, locale or timezone change.

The pre-release checklist maps each item to a test class from the incident page. The first-30-minutes checklist covers detection, containment, the rollback decision and customer communication.

6 pre-release items · 6 first-30-minutes items · verified 2026-10-22

Pre-release checklist

  • PR-01
  • PR-02
  • PR-03
  • PR-04
  • PR-05
  • PR-06

First 30 minutes

  • FM-01
  • FM-02
  • FM-03
  • FM-04
  • FM-05
  • FM-06

Download the checklist

Only in this checklist

PR-05 is the only item among 7 published checklists in this group that relies on synthetic monitoring: Add a post-change smoke step that creates a note, reads its timestamp back and fails if the offset differs from the account timezone.

Questions

What should be checked before a release to prevent Encoding or timezone shift?

6 pre-release items, PR-01 to PR-06. PR-01: Assert in every environment that the application timezone configuration variable is set to a non-NULL value before the serving change goes live.

Is there a rollback plan for Encoding or timezone shift?

The first-30-minutes checklist has 6 items. FM-01: Compare the timestamps of records written since the deploy with the account timezone and record the exact offset.

What should a team do in the first 30 minutes after Encoding or timezone shift is detected?

The first-30-minutes checklist has 6 items. FM-01: Compare the timestamps of records written since the deploy with the account timezone and record the exact offset.

Which configuration checks apply to Encoding or timezone shift?

PR-01: Assert in every environment that the application timezone configuration variable is set to a non-NULL value before the serving change goes live. PR-02: Diff the timezone and locale settings of the new serving layer against the old one and block the release on any difference.

Is a Encoding or timezone shift checklist still needed if deployment is automated?

Yes. Automation runs the steps; the checklist names what the tests must cover: configuration and environment tests, integration tests and synthetic monitoring.

Which pipeline stages does the Encoding or timezone shift checklist cover?

The pre-release items map to the pre-deploy and post-deploy stages.