Dependency removed from registry: pre-release and first 30 minutes checklists

A package or version is pulled from a registry and builds or deploys fail.

The pre-release checklist maps each item to a test class from the incident page. The first-30-minutes checklist covers detection, containment, the rollback decision and customer communication.

6 pre-release items · 7 first-30-minutes items · verified 2026-10-22

Pre-release checklist

  • PR-01
  • PR-02
  • PR-03
  • PR-04
  • PR-05
  • PR-06

First 30 minutes

  • FM-01
  • FM-02
  • FM-03
  • FM-04
  • FM-05
  • FM-06
  • FM-07

Download the checklist

Only in this checklist

Every test class in this checklist also appears in at least one sibling checklist in the group; the item texts differ: Run a clean dependency install from the public registries with no local cache on a daily CI schedule and fail on any package or version that is not found.

Questions

What should be checked before a release to prevent Dependency removed from registry?

6 pre-release items, PR-01 to PR-06. PR-01: Run a clean dependency install from the public registries with no local cache on a daily CI schedule and fail on any package or version that is not found.

Is there a rollback plan for Dependency removed from registry?

The first-30-minutes checklist has 7 items. FM-01: Read the install or pull error and record the exact package, version or image tag that no longer resolves.

What should a team do in the first 30 minutes after Dependency removed from registry is detected?

The first-30-minutes checklist has 7 items. FM-01: Read the install or pull error and record the exact package, version or image tag that no longer resolves.

Which configuration checks apply to Dependency removed from registry?

PR-04: List every image referenced in deployment values and fail CI when one points at a repository that has been removed or moved. PR-05: After a repository switch, confirm that every image reference, including the policy reports cleanup job, points at the new repository. PR-06: Point the build at a registry mirror the team controls and confirm it holds each pinned version, including transitive pins such as string padding 0.0.3.

Is a Dependency removed from registry checklist still needed if deployment is automated?

Yes. Automation runs the steps; the checklist names what the tests must cover: integration tests and configuration and environment tests.

Which pipeline stages does the Dependency removed from registry checklist cover?

The pre-release items map to the pre-deploy and post-deploy stages.